At last I finished the Butterflies & Wedges on the upper side of the top.
Skipped one Butterfly cause of another one already there.
Flipped it over and the 16 Butterflies for the down-side are waiting.
Donnerstag, 24. März 2011
Donnerstag, 24. Februar 2011
A little here and there
Donnerstag, 17. Februar 2011
Some planing & butterflies
Rough Planing of the top to create a flat surface - not 100% but enought to have a reference.
Used some winding sticks to eleminate the twist.
8 butterflies to connect the middle-blocks done ... so 1/4 of the 32 pieces which remain for the top.
Much dust and shavings but no heaving the top around.
Used some winding sticks to eleminate the twist.
8 butterflies to connect the middle-blocks done ... so 1/4 of the 32 pieces which remain for the top.
Much dust and shavings but no heaving the top around.
Freitag, 11. Februar 2011
Here is the TOP!
Removed the clamps - heaved it horizontal and there it is:
Rough, ugly and big!
The surface will be planed at the end (when the feet are on).
The next step will be the 32 butterflies, which hold the beams and the middle-blocks together.
Call it an overkill, but I don't want a 150 kg-Workbench falling apart.
Rough, ugly and big!
The surface will be planed at the end (when the feet are on).
The next step will be the 32 butterflies, which hold the beams and the middle-blocks together.
Call it an overkill, but I don't want a 150 kg-Workbench falling apart.
Gluing up the top - second day, second beam
First I had to minimize the heave-work, so I put the second beam on a little higher position next to the fist beam with blocks:
now I could heave one end of the second beam on or off the middleblocks and then the other end.
The next thing was to plane the middle-blocks to fit the second beam.
I began with the light-through-method:
quite a lot of light ... so nothing to plane off from this block ... now.
After a while I changed to the method of putting carbon-paper between the gluing areas. By rubbing the woodpieces against each other I created black marks where to plane:
... here you can see the marks on the right side and top.
After heaving the beam uncount times I decided that it was enough and glued the whole thing up:
Now wait a while ..
now I could heave one end of the second beam on or off the middleblocks and then the other end.
The next thing was to plane the middle-blocks to fit the second beam.
I began with the light-through-method:
quite a lot of light ... so nothing to plane off from this block ... now.
After a while I changed to the method of putting carbon-paper between the gluing areas. By rubbing the woodpieces against each other I created black marks where to plane:
... here you can see the marks on the right side and top.
After heaving the beam uncount times I decided that it was enough and glued the whole thing up:
Now wait a while ..
Donnerstag, 10. Februar 2011
Gluing up the top
Now the inner side of the back beam is planded flush and the middle blocks are fitted for gluing.
Here we go with the first one:
The bottom piece is the beam (with the butterflies in it).
Above is the end-middle-block and on top is a waste wood as a supplement.
Here the two endblocks are already glued on, the two middleblocks are clamped.
On the left side one can see the other beam with freshly glued wedges filling the cracks between the butterflies.
Here we go with the first one:
The bottom piece is the beam (with the butterflies in it).
Above is the end-middle-block and on top is a waste wood as a supplement.
Here the two endblocks are already glued on, the two middleblocks are clamped.
On the left side one can see the other beam with freshly glued wedges filling the cracks between the butterflies.
Dienstag, 8. Februar 2011
92 Butterfly spines ... DONE!
Week after week I worked the splines in.
After a while I got a good method for cutting the splines and for the chisel work:
so after uncount hours all of the 92 splines are in the wood.
Most wedges glued in and everything sawed flush ... more or less.
After a while I got a good method for cutting the splines and for the chisel work:
so after uncount hours all of the 92 splines are in the wood.
Most wedges glued in and everything sawed flush ... more or less.
Abonnieren
Posts (Atom)